Tredegar Ambulance Station

Communal Heating, ASHP, Solar PV and Battery Storage

Decarbonisation of an active 24/7 emergency service hub for the Welsh Ambulance Service NHS Trust: failing gas boilers replaced with Air Source Heat Pump, Solar PV and battery storage, delivered with zero operational downtime.

Swipe for more →

CLIENT

Welsh Ambulance Service NHS Trust

PROJECT TYPE

ASHP, Solar PV and battery storage replacing failing gas boilers

FORM OF CONTRACT

Turnkey design-and-install, single-site direct award

VALUE

£160,000 — delivered to budget, no overruns

SCHEME SIZE

1 site — Tredegar Ambulance Station, NP22 4NP

TIMELINE

January – April 2025 (3-month delivery)

Project highlights

Swipe for more →

Flagship for sustainable emergency infrastructure in Wales

c.50% carbon emissions reduction

£160k delivered to budget with no overruns

Zero accidents or incidents

100% operational availability of ambulance egress/access throughout the 3-month delivery

Outcomes and KPIs achieved

Swipe for more →

Project completed on time within £160,000 budget

Zero accidents or incidents

100% operational uptime maintained throughout

G99/DNO and MCS certification achieved on first attempt

c.50% carbon reduction achieved post-commissioning

100% positive feedback in the post-installation survey from the station manager and crew

Challenges, solutions and lessons learned

Challenge
24/7 active emergency operation.

Solution
Phased delivery with a temporary heating skid and a “Blue-Light Protocol” to ensure zero downtime.

Challenge
Roof structural integrity and waterproofing.

Solution
Bespoke Nicholson non-ballasted mounting system, following the pre-installation structural survey.

Compliance and certifications

Overview

CEN was commissioned to design, supply and install a Solar PV, battery storage and Air Source Heat Pump system at Tredegar Ambulance Station, replacing a failing gas-fired plant. The site is an active 24/7/365 emergency hub for the Welsh Ambulance Service NHS Trust, demanding zero interruption to power, heating, vehicle readiness or staff welfare.

CEN delivered a £160,000 turnkey solution between January and March 2025, with the system formally commissioned and handed over in April 2025. The integrated ASHP–Solar PV–battery design provides a c.50% reduction in carbon emissions and gives the Trust long-term protection against rising energy costs, freeing budget for frontline patient care.

Measures and technologies

  • Air Source Heat Pump (ASHP) — communal heating system, 45°C design flow temperature
  • Solar PV — roof-mounted, sized to offset ASHP electrical demand
  • Battery Energy Storage System (EESS) — 20kW
  • Gas boiler decommissioning and pipework upgrade
  • Heat emitter replacement and increased insulation
  • DNO G99 application and approval
  • SolarEdge fireman’s gateway (full system shutdown for emergency safety)